On this project we designed, manufactured and installed the windows and doors to the sides and end of the new cliff lift bridge.
The larger windows had to be designed to withstand the required barrier loadings of the external wind elements and also as a protection barrier to keep the public safe.
The smaller top windows were designed with opening vents operated by folding cam openers to allow ventilation on hot days.The client specifically requested a blue tint glass which fits the project and location.
The majority of the installation of the windows was done off site at our works in Christchurch to avoid working at height with only the glass left to be installed on site.